Question:
I was yesterday working on a field of 20 ha an average slope of 0.017%
and 0.04%. Very little dirt was moved to make it flat but I do not like
it.
Answer:
We would not generally go below 0.05% minimum slope in main slope
direction. Prefer 0.066% minimum if not too much more earth shift. If
earthworks are less than say 100m3/ha we will often increase minimum
slope and smoothing and reduce maximum slope until earthworks get up to
100m3/ha or more.